Case studies: measured results in real operations
Enacom projects organized by industry. Each case study covers the challenge, what was done, and the measured result.
Steel
Planning and sequencing for the steel shop, torpedo cars, yard, and rolling, in integrated mills and Mini-Mills.
Integrated planning in a Mini-Mill
13.5% fewer stand changes per month in a Mini-Mill’s section rolling
View caseSection rolling
Fewer stand changes and production in line with the plan in two section rolling mills
View caseLogistics
Integrated planning of rail, terminals, and ports, with scenarios compared in minutes.
Digital S&OP at VLI
VLI: 5% more planning accuracy in logistics, with scenarios in about 2 minutes
View caseEnergy & Utilities
Hydropower generation scheduling, with water use and operating constraints in the same analysis.
Hydropower Optimizer at CEMIG
CEMIG: up to 46.6 hm³ less water per month in the Três Marias plant schedule, in a study
View caseSupply Chain
undefined
Logistics network and Distribution Centers
Steelmaker identifies 304 supply chain improvement opportunities by optimizing its distribution network
View caseMining
Loading and hauling simulation, road and rail logistics, and blending silo sizing, with scenarios compared before investing.
Open-pit mine investment prioritization
Mining company simulates loading and hauling to prioritize investments and points to up to 4% productivity gain
View caseRoad and rail logistics optimizer
Logistics planning now shows, before execution, how much the operation can move and where the bottleneck is
View caseBlend optimizer and silo sizing
Optimized silo sizing points to 15% lower installation cost and 20% higher operating efficiency in a coal blending plant
View caseWant to see what a Digital Twin does in your operation?
Tell us the challenge and our team will assess with you where a Digital Twin can deliver results.