Material losses
Anticipating what will be short or in excess avoids discarding work in process and reprocessing.
Solution by decision
A large share of industrial cost comes from planning decisions: lost material, energy, movements, and waiting. Enacom Digital Twins bring these costs into the decision.

Anticipating what will be short or in excess avoids discarding work in process and reprocessing.
Sequences that make better use of heat and equipment reduce consumption and emissions.
Fewer yard movements and shorter queues mean fewer equipment and crew hours.
Water, fleet, and capacity are allocated considering the cost of each alternative.
The Gemminus platform Digital Twins that support this topic.
Results measured in real operations, tied to this decision.
CEMIG: up to 46.6 hm³ less water per month in the Três Marias plant schedule, in a study
View caseMaterial losses, energy and fuel consumption, movements, waiting, and the use of scarce resources such as water and fleet, depending on each operation.
No. The idea is to decide better within the operation's real constraints, without relying on cutting capacity.
Each case study on this page shows the challenge, what was done, and the result measured in the client's operation.
See other topics where Enacom supports the operation.
Increase productivityImprove operationsUnderstand cost and marginFlow and SKU performanceRisk and capacity
Tell us what limits results today. Our team will assess with you where a Digital Twin can deliver value first.